Crystallin
Reviving 1960s architecture
Boulevard Jules Fabre
Completed
Offices
Client
Groupe Cardinal
Designers
Sud Architects
Area
4,324 m²
Actice use
525 m²
Calendar
Completed
The Crystallin project involved the renovation of the old Grand Lyon Habitat headquarters, while maintaining a few of its remarkable architectural features.
Part of the original building was preserved, while part of it was raised and given an extension. In all two thirds of the existing building’s area was rebuilt. Energy performance was improved by renovating the façade. The block has planted terraces and a central open garden area giving it a strong green identity. New modular open plan offices offer the service sector greater freedom. Architectural heritage has not been forgotten. The monumental indoor staircase was enhanced.